The gas interconnector between Bulgaria and Greece already has received a pre-operational license (Act 15) for the territory of Bulgaria, the project company "ICGB", which will be the operator of the gas pipeline, has announced. From there, they assured that the procedures for putting the gas interconnector into operation are progressing according to schedule and it will start commercial operation on October 1.
The first F-16 Block 70 aircraft for the Bulgarian army landed today at Graf Ignatievo air base. Before landing, it flew past the renewed multipurpose runway, renovated for the new fighter aircraft – the only runway in the country suited to..
Housekeepers (76%), cooks (68%), receptionists (57%), waiters (50%), bar tenders (26%) and technical staff (23%) are in demand most for the tourist season 2025 on the Bulgarian Black Sea coast. Only 10% of the hotels are looking for staff at a..
Protests will take place in front of the court houses in Sofia, Varna, Plovdiv, Burgas and Stara Zagora against pedophilia and crimes against children. The demands raised by the protesters include establishing a public register of pedophiles..
The upgrade of the Bulgarian supercomputer Discoverer has been completed successfully, and the machine now has new systems capable of additional..
On Thursday there will be significant cloudiness with rain showers. The lowest temperature will slightly rise and will be between 4°..
For the first time, the Day of the Bulgarian Canning Industry will be marked on April 3. The solemn event will take place in the..
+359 2 9336 661