Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

There is progress in finishing off the work on the gas interconnector with Greece: Minister of Regional Development

Photo: icgb.eu

Despite the tensions arising from the tight deadlines, the government is making efforts so that the construction of the gas interconnector with Greece may be finished as soon as possible, caretaker Minister of Regional Development and Public Works Ivan Shishkov said, and added that all documents connected with the construction of the Bulgaria – Greece interconnector, carried out so far, should be received by the end of next week. Minister Shishkov expressed the hope that the construction work on the connection will be completed by mid-September, the more serious work remaining being that on the section in Haskovo region. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Snow, rain and freezing temperatures

Minimum temperatures on Monday will be between minus 4 and 1°C. In Sofia it will be around minus 3°C. The mercury will hover between -3 and 0 °C in the north. Maximum temperatures in southern Bulgaria will be between 2 and 7°C. In the capital it will..

published on 2/16/25 7:05 PM

New Russian emigration in Bulgaria pays tribute to Alexei Navalny

The one-year anniversary of the death of Russian opposition leader Alexei Navalny was marked with a memorial service in Sofia's St Nedelya Cathedral. It was organised by the movement "For a Free Russia" - an association of Russian immigrants in..

published on 2/16/25 5:39 PM

Scientists bring back live fish from Antarctica 

Kristiyan Vladov and Stefan Kyurkchiev of the Plovdiv Museum of Natural History are working on a project to bring live fish from the southern Arctic Circle to Bulgaria . The aim is to create an Antarctic aquarium in Plovdiv, where visitors - from..

published on 2/16/25 2:04 PM