“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
Due to the outbreak of Peste des Petits Ruminants (sheep and goat plague) in Velingrad and the subsequent protests by farmers, 300 new samples will be taken today. Currently, 1,700 sheep are at risk of being forcibly euthanized. The decision for a..
Exactly a month after the parliamentary elections on October 27, the first session of the 51st National Assembly, which started on November 11, continues today. MPs will make a sixth attempt to elect a speaker. During the fifth..
Wednesday will be mostly sunny. There will be weak to moderate west-northwesterly wind. The lowest temperatures are expected to be between minus 3° and 2°C; in Sofia - around minus 1°C. The highest temperature will reach 10°C to 15°C;..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661