The EU Energy Council has agreed that gas storage sites in the Community must be filled to at least 80% of their capacity by Nov. 1, 2022, and to 90% by Nov. 1 in subsequent years.
In the case of Bulgaria, which only has the Chiren gas storage facility, this means that it must be filled to 4.64 terawatt hours (TWh) for the coming winter and to 5.22 TWh for the winter of 2023.
During the meeting of the Council in Luxembourg, an agreement was signed between Bulgartransgaz EAD and the EU, under which the European Commission finances the expansion of the Chiren depot within the framework of the Connecting Europe Facility (CEF) with EUR 78 million, i.e. 80% of the price. The expansion will increase the storage volume at Chiren to one billion cubic metersand the daily production and injection capacities to 8-10 mcm.
The remaining BGN 125 million (EUR 63.9 million) under the so-called ''Ukrainian aid'' will be paid by the end of November, caretaker Deputy Premier and Minister of Finance Lyudmila Petkova told journalists after a meeting with representatives of the..
On October 10, farmers will receive transfers totaling BGN 200 million (EUR 102 million) under the so-called "Ukrainian aid", announced caretaker Minister of Agriculture and Food Georgi Tahov. At a meeting with representatives of the agricultural..
The liquefied natural gas (LNG) terminal at Alexandroupolis, of which Bulgaria is co-shareholder, is already contributing to competitiveness in Greece and Bulgaria, but also in the entire region, said caretaker Energy Minister Vladimir Malinov after..
The Russian state oil company Lukoil has plans to sell its Bulgarian refinery Neftochim based in Burgas on the Black Sea Coast. It is the largest in the..
+359 2 9336 661