“92% of the Gas Interconnector Greece-Bulgaria, ICGB, is ready. The interconnector will be ready by the end of June, and will be tested with gas as of July,” Teodora Georgieva, Bulgarian Executive Officer of the company ICGB which is constructing the interconnector said for public service TV BNT.
"The 182-km. long linear part of the pipeline is ready. The pipes have been laid and covered, tests have been conducted. Besides Covid-19, the construction work has also been slowed down by delayed crane deliveries, but they too have now been tested. What remains is the construction of the gas stations in Stara Zagora in Bulgaria and in Komotini in Greece. The construction company is due to pay damages of EUR 90,000 per every day of delay after the beginning of 2022. The pipe’s capacity, which is 3 million cubic metres, and it has already been reserved," Teodora Georgieva said.
In the space of 15 years, from 2005 until 2020, 75% of the farms in the country have disappeared – from 500,000 in 2005 down to 132,000 in 2020, said Prof. Dr. Bozhidar Ivanov, Director of the Institute of Agrarian Economics at an international..
In October 2024, the total business climate indicator decreased by 5.6 percentage points compared to September, dropping from 22.5% to 16.9%. The index declined in all monitored sectors, the National Statistical Institute announced. In industry, the..
Petar Ganev , senior researcher at the Institute for Market Economics announced, for the BNR, the publication of their white paper of the Bulgarian economy – Unlocking growth: the road ahead after the election. “Concord should be sought and..
+359 2 9336 661