Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Center for controlled environmentally-friendly production opens in Bulgaria

Photo: „Nelson and Pade", Inc.®

The Trakia University in Stara Zagora has established the first Aquaponics Center in Eastern Europe. The university's educational, research and industrial center for controlled environmentally friendly production is located on 4,000 square meters and uses systems by an American leader in this type of industry, the university said.

The production cycle starts this spring and the produce will be on the market in the autumn. With continuous production, the annual produce will reach about 120,000 green leafy organically produced plants and about 3 tons of fish.

Aquaponic technology is a process in which beneficial bacteria in aquatic environment turn fish waste into plant nutrients, which are absorbed and this helps purify the water in which fish live. The natural microbial process keeps fish and plants healthy and at the same time maintains a symbiotic environment in which all three species - beneficial microorganisms, fish and plants can thrive. The benefits of this type of production are not only economic but also environmental. With minimal labor, energy and water resources, the quality of plants is maintained without pesticides or herbicides.

Compiled by: Darina Grigorova

English: Alexander Markov



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Low debt, Euro aspiration and EU membership are the positive factors in Moody's assessment of Bulgaria

Moody's expects Bulgaria to join the Eurozone no later than the beginning of 2026. According to the rating agency, the growth of the Bulgarian economy in 2024 will be 2.9%. The ongoing domestic political crisis and the likelihood of new early elections..

published on 7/30/24 12:30 PM

The state will continue to provide compensation to businesses over the price of electricity

Until the end of 2024, businesses will continue to receive compensations for high electricity prices. They will be 100% after a price of over 90 euros per megawatt hour on the stock exchange. The previous threshold was 100 euros. The..

published on 7/26/24 3:13 PM

Bulgarians keep more than 75 billion euros in banks, money sent by emigrants is also growing

Deposits in banks for the first quarter of 2024 have reached a record level of 75.4 billion euros. From January to March, deposits grew by EUR 1.35 billion or by 1.8%. The rise is mainly due to increased household deposits, the..

published on 7/25/24 9:45 AM