Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

The map showing Covid-19 bed occupancy to be divided into 5 zones

Chief State Health Inspector Angel Kunchev
Photo: mh.government.bg

The map showing the occupancy of Covid-19 beds will be divided into 5 zones- Sofia, Plovdiv, Pleven, Stara Zagora and Varna. There will be big university hospitals with enough Covid-19 beds in each zone. 

The proposal was made by mathematician Nikolay Vitanov and confirmed by this country’s Chief State Health Inspector Angel Kunchev. Currently, the authorities are developing a program that would provide real time information about the occupancy of Covid-19 beds. We are not discussing abolishing the green certificate issued to people with antibodies, because many people rely on these certificates, Angel Kunchev noted.

The Omicron coronavirus variant is spreading quickly, but occupancy of intensive care beds is low, Premier Kiril Petkov said before the beginning of today’s sitting of the cabinet. 




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Classic car parade takes place in Burgas today

The 17 th classic car and motorcycle parade is to take place in Burgas’ Primorski Park from 10 AM until 2.30PM today. More than 150 collectors from Burgas and the country will take part, Dimo Dzhambazov, chair of the Retro motor club, organizer of..

published on 7/6/24 7:55 AM

Weather forecast: Over the weekend temperatures will rise

On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..

published on 7/5/24 6:45 PM

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..

published on 7/5/24 6:13 PM