The construction of a tunnel through the Kresna Gorge is the most expedient and environmentally-friendly option for the route of the Struma Motorway, Deputy Prime Minister and Minister of Environment Borislav Sandov has told BNT. In the area of Kresna, the route cannot be a real highway, but rather a high-speed road, Sandov added.
The high-speed road cannot pass through the gorge itself, because this would be in violation of environmental legislation. The section must pass through a bypass or tunnel. The construction of a bypass is cheaper, but would generate more carbon emissions. That is why, according to Sandov, it was best to build a tunnel. The options will be discussed with Minister of Regional Development Grozdan Karadzhov.
PP-DB will not support a candidate for Speaker of the 51st Parliament from any party that has not supported the coalition's declaration for a cordon sanitaire against Delyan Peevski. They pointed out that this was the only way to..
The trial of six Bulgarians accused of spying for Russia continues in the United Kingdom. The head of the "spy cell" Orlin Rusev and Biser Dzhambazov pleaded guilty. Three others - Katrin Ivanova, Vanya Gaberova and Tihomir..
Today's eighth attempt by the Bulgarian MPs to elect a speaker of the National Assembly also proved unsuccessful. At the beginning of the day, there was a ray of hope that this time the people's representatives would reach a..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
+359 2 9336 661