Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Large-scale scheme for embezzling money from Hemus Motorway project revealed

Photo: BGNES

30 million euros of the money for lot 5 of the Hemus Motorway were diverted, the General Directorate Combating Organized Crime revealed. This happens after two days ago an operation in Sofia and other cities in the country, related to the construction of the Hemus highway was held. The money was transferred to hollow companies and then withdrawn in cash. Most of these fictitious companies were registered in the name of low-income people, and some of them were criminals.

A total of 45 million euros had been allocated in advance for the construction of Lot 5, and so far there have been no actual construction activities there. The investigation revealed that several crimes had been committed in the case. The General Directorate Combating Organized Crime has received information that people who are involved in these crimes wanted to destroy documents. This necessitated a large-scale operation. A total of 17 addresses have been searched so far and 20 people have been questioned. The investigation continues.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria to grant WHO EUR 100,000 in aid for the civilian population in Gaza

The Council of Ministers has approved the draft of a donation agreement between the World Health Organization and Bulgaria on the provision of a voluntary contribution, amounting to EUR 100,000, in support of the activities of the organization in the..

published on 11/21/24 9:20 AM
Ivan Kondov (L) and Igli Hasani

Foreign ministers of Bulgaria and Albania reaffirm support for accelerated construction of Corridor 8

Bulgaria’s caretaker Foreign Minister Ivan Kondov and his Albanian counterpart Igli Hasani confirmed the firm commitment of the two countries to the accelerated construction of transport Corridor 8. Romania has asked to join the construction..

published on 11/21/24 9:04 AM

Gale-force winds inflict damage in Vratsa and the environs

Winds of up to 120 kms. per hour inflicted damage in Vratsa, the biggest town in Bulgaria’s Northwest. Dozens of reports have come in of fallen trees and branches onto vehicles and roads, damaged equipment and torn overhead cables. There were..

published on 11/21/24 8:43 AM