The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
"I expect the Central Election Commission to ensure strict compliance with the provisions of the Electoral Code", President Rumen Radev told journalists in Radnevo, where he attended a ceremony on the 60th anniversary of the declaration of..
''Ursula von der Leyen is expected to choose a woman as a candidate from Bulgaria for European Commissioner, primarily due to the severely disrupted gender balance in the European Commission.” This prediction was made by MEP Radan Kanev from the Group..
Bulgarian caretaker Minister of Defense Atanas Zapryanov and his German counterpart Boris Pistorius signed a programme agreement for the joint purchase of IRIS-T air defense missile systems. The agreement was signed during a meeting of the Ukraine..
From today until September 15, Sofia's Vitosha boulevard and the park in front of the National Palace of Culture are transformed into a huge open-air..
The two wings of the Movement for Rights and Freedoms party, which intend to participate in the early parliamentary elections on October 27 in coalitions,..
It is 80 years, on 9 September, since the communist coup d'état which put an end to the Kingdom of Bulgaria. Talking about the communist past is..
+359 2 9336 661