Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Third national protest of road construction companies, demand minister's resignation

Photo: BGNES

Bulgaria's Regional Development Minister Violeta Komitova did not appear at the agreed meeting with the representatives of the protesting road construction companies. They described this as a mockery and demanded her resignation. 

Eng. Georgi Zlatev from the Control Council of the Roads Branch Chamber warned that there was a danger that roads in Bulgaria would remain uncleaned in the winter.

The ministry proposes that the funds owed by the state to road construction companies be paid in a reasonable period ahead through the 2022 and 2023 budgets, Deputy Minister Valentin Gramatikov said. 

Gramatikov was adamant that it was impossible to allocate nearly 500,000 euros by the end of 2021 to pay all debts to the road construction and repair industry and there were only 50 million euros allocated for winter cleaning and maintenance.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM