An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.
The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.
The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule.
Caretaker Minister of Defence Atanas Zapryanov has confirmed Bulgaria's commitment to the joint efforts of the European Union in support of Ukraine. He did this in Brussels at a meeting of the Foreign Affairs Council. Atanas..
For another year, on the eve of the Day of the Christian Family, priests and their relatives will donate blood for patients in need. The campaign will be held at the Blood Center of the Military Medical Academy in Sofia. With the..
The MPs of the 51st National Assembly continue their first session, which began on November 11. They will gather to try to elect their speaker for the fourth time. GERB-SDS confirmed again that they will not withdraw their candidacy -..
Bulgaria has become the first in the EU to have a high-tech artificial intelligence in its own language , created by a state-funded scientific..
According to an analysis by the Electricity System Operator, a shortage of electricity is expected as early as January and February next year. At a..
Bulgaria’s caretaker Foreign Minister Ivan Kondov and his Albanian counterpart Igli Hasani confirmed the firm commitment of the two countries to the..
+359 2 9336 661