Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Military exercise at Shabla in the Black Sea resumed

Photo: BGNES, archive

The second part has begun of the military exercise at the air defence range in Shabla. Three MiG-29 fighter aircraft from Serbia will be taking part in the maneuvers. The exercise will be conducted by the air defence units of the ground troops and the naval forces.

Because of the exercise, the Ministry of Defence has declared sections of the airspace and maritime space in the region of Cape Kartalborun, Cape Kaliakra and the 100-kiloemtre line from the coastline to be dangerous.

At the beginning of June, during the first Shabla exercise, a MiG-29 fighter went down in the Black Sea off Cape Shabla. The pilot was killed. The investigation is ongoing, and the aircraft’s black box is expected to be sent to Russia for deciphering.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

The deadline for submitting applications for voting abroad expires at midnight

The deadline for Bulgarians living abroad to apply for the opening of polling stations for the early parliamentary elections on October 27 expires on October 1 at midnight. By law, polling stations abroad are opened in Bulgaria’s diplomatic and..

published on 10/1/24 9:19 AM

Government aircraft evacuates Bulgarians from Lebanon, new flight expected

Some of the Bulgarians in Lebanon were evacuated on a government aircraft flight on Monday evening. The first group, consisting of 89 people, mostly families, mothers with children and elderly people, was welcomed by caretaker Premier Dimitar..

published on 10/1/24 8:46 AM
Energy Minister Vladimir Malinov

Alexandroupolis LNG Terminal starts commercial operations

The commercial launch of the liquefied natural gas terminal in Alexandroupolis, Greece, is expected today . The terminal has already successfully completed all commissioning tests. The opening was originally scheduled for April 2024, but was later..

published on 10/1/24 7:30 AM