The cost of completing the two units of the Belene Nuclear Power Plant will be between 8 and 9.5 billion euro, estimates by the Bulgarian Atomic Forum Bulatom show.
Almost 1.5 billion euro has so far been spent on the project. Bulatom has estimated that it will take around 15 years after the units are made operational for the investment to pay off, and that the price of the electricity it produces may be lower than the stock market price. If Belene NPP’s two units function at full capacity they will be able to produce an annual 16 million megawatt hours of electric energy.
According to Bulatom the project is economically sound as the units can function for at least another 45 years after the investment has paid off.
A mural dedicated to the 20th anniversary of Bulgaria's NATO accession will be unveiled today in Pernik. The event will be attended by the ambassadors of Great Britain, Turkey and Montenegro, Deputy Foreign Minister Nevyana Miteva, Pernik Regional..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed will reach 10-15 m/s. With it, cold air will invade the country and temperatures will drop and by..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor Bozhankov", the party's co-chairman Kiril Petkov wrote on Facebook. Silvi Kirilov, nominated by "There..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
During the night it will be cloudy with rainfalls in the western and central regions of Bulgaria, as snowfalls are possible in the..
+359 2 9336 661