The cost of completing the two units of the Belene Nuclear Power Plant will be between 8 and 9.5 billion euro, estimates by the Bulgarian Atomic Forum Bulatom show.
Almost 1.5 billion euro has so far been spent on the project. Bulatom has estimated that it will take around 15 years after the units are made operational for the investment to pay off, and that the price of the electricity it produces may be lower than the stock market price. If Belene NPP’s two units function at full capacity they will be able to produce an annual 16 million megawatt hours of electric energy.
According to Bulatom the project is economically sound as the units can function for at least another 45 years after the investment has paid off.
The European Commission has decided to close the infringement procedure against Bulgaria for the non-implementation of its obligations to revise and update the Second Flood Risk Management Plans and the Third River Basin Management Plans. A statement..
Physicist Acad. Ivan Todorov passed away at the age of 91, the press center of the Bulgarian Academy of Sciences announced. Acad. Todorov was a scientist with outstanding achievements and world recognition in the field of modern..
Sofia Airport operates normally in winter conditions, BTA has reported. The runways for take off and landing have been cleaned. The aircraft are being treated against icing. Passengers are advised to arrive at the terminals at..
Kristiyan Vladov and Stefan Kyurkchiev of the Plovdiv Museum of Natural History are working on a project to bring live fish from the southern Arctic..
The one-year anniversary of the death of Russian opposition leader Alexei Navalny was marked with a memorial service in Sofia's St Nedelya Cathedral. It..
Bulgarians and Serbs from the towns of Tsaribrod and Pirot marched in support of the student protests in Serbia , reports BTA. "We want the students'..
+359 2 9336 661