Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

BMA calls for rapid establishment of new state body for Covid-19 response

D-r Ivan Madzharov, head of the Bulgarian Medical Association
Photo: BGNES

The vacuum created by the disbanding of the National Operational Headquarters for fighting the Covid-19 pandemic must be filled as soon as possible, the chairman of the Bulgarian Medical Association, Dr. Ivan Madzharov, said in an interview for BNT.

An operational state body is needed to monitor, analyze and offer solutions in this situation, because there is definitely no evidence that the virus has left and we are returning to our normal way of life, Dr. Madzharov said.
"You know that various experts are involved in the headquarters, and mathematical models are made there," said Dr. Madzharov. According to him, if the Ministry of Health temporarily undertakes this task, it should be for a short time and as soon as possible a new body should be set up.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Minister of Innovation: There was video surveillance in more than 99.5% of the polling stations

Over 99.5% of Bulgaria's polling stations were covered by video surveillance in the October 27 parliamentary elections. This was stated at a briefing by the Caretaker Minister of Innovation and Growth Rosen Karadimov, appointed by the caretaker..

published on 11/4/24 6:05 PM

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM