“Kozlodyu NPP-New Build” Plc and NuScale Power LLC have signed a memorandum of understanding to consider deploying NuScale’s small modular reactor technology at the Kozlodyu site, two companies announced.
The document implements the cabinet’s decision, taken on November 14, 2020, to study the possibility of building another nuclear facility at Kozlodyu nuclear power plant in the context of the EU targets to ensue energy diversification and climate neutrality by 2050.
The memorandum of understanding is a proven commercial practice for projects of mutual interest which does not impose obligation for future investment decision or financial costs, reads the joint statement.
Speaking to journalists during her visit to the town of Gotse Delchev in the Blagoevgrad region, Vice-President Iliana Iotova described the newly elected National Assembly as "illegitimate". According to her, the reports of violations and the..
On Friday, there will be fog in the valleys. The lowest temperatures will range between minus 5°C and 0°C, for Sofia around minus 3°C. It will be sunny during the day. The maximum temperatures will range from 14°C to 19°C, for Sofia around 16°C...
BSP and ITN will ask the Constitutional Court to give the full rights to form a caretaker cabinet back to the president, Borislav Gutsanov from BSP - United Left has told the BNR. "BSP-United Left will be the guardians of the..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
Acting Energy Minister Vladimir Malinov told a briefing that neither he nor the Energy Ministry had any information about the sale of Lukoil Neftohim..
Metallurgy, heavy and mining industry are an irrevocable part of the full-fledged economic development of Europe. This was stated by Bulgarian President..
+359 2 9336 661