“Bulgaria will build 200 kilometres of gas pipelines worth 250 million euro in the Maritsa coal basin, indicates the updated national restoration plan under which the country is to receive EU funding for sustainable development. The pipes can be used for the delivery of hydrogen which is the backbone of the essential reform of the Maritsa coal basin and will directly eliminate the carbon emissions from electricity generation,” said Ivelina Vasileva, Chair of the parliamentary Environment and Waters Committee during an online conference “EU Recovery and Sustainability Fund for the transition in Bulgaria.”
The changes to the national plan reflect the criticism that the projects do not include the coal mining regions which are key to energy transformation, investor.bg writes.
In 2023, the government budget deficit was 2% of GDP or €1.9 billion. This is indicated by the final data of the National Statistical Institute. This is a significant narrowing of the budget deficit compared to the previous 3 years...
A forum entitled "Career and Life - Why in Bulgaria?", organized by the Bulgaria Wants You platform, was held at the Royal Geographical Society in London on October 20. The event, which took place for the second time, attracted significant..
International rating agency Fitch Ratings has affirmed Bulgaria's long-term foreign and local currency credit rating at BBB with a positive outlook, the Finance Ministry said. The positive outlook reflects the country's prospects for eurozone..
The Russian state oil company Lukoil has plans to sell its Bulgarian refinery Neftochim based in Burgas on the Black Sea Coast. It is the largest in the..
+359 2 9336 661