The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
From March 9 to 11, 2025, Inter Expo Center in Sofia plays host to the 41st edition of Holiday & SPA Expo. The event, organized with the support of the Bulgarian Ministry of Tourism, traditionally becomes a meeting point for leading experts,..
The budget for 2025 is feasible and will likely be the last one in Bulgarian leva, Minister of Finance Temenuzhka Petkova said in an interview with bTV. The draft law on the state budget for 2025 has been prepared without increasing existing..
A Bulgarian-Ecuadorian Business Forum will be held in Bulgaria, jointly organized by the Bulgarian Chamber of Commerce and Industry and the Pro Ecuador office in Italy, accredited for Bulgaria. The event will take place on March 13, 2025 at the..
+359 2 9336 661