Bulgaria has the right to deny access to Balkan Stream's gas infrastructure. This is what the MPs wrote in the final amendments to the Energy Act. The right of this country to refuse access to the gas pipeline is related to the European directive on gas infrastructure from 2019, BNR’s Dobrina Karambolova reported.
The changes also eliminate the 5% fee paid to the Electricity System Security Fund by producers of electricity from renewable energy sources. Adopted changes envisage that producers with a total installed capacity of 500 kilowatts to 1 megawatt will be able to enter the free market.
Tenders for reservation of cold reserve capacities for production of electricity have been canceled.
Japan's Sumitomo Electric Bordnetze plans to cease operations at one of its factories in Bulgaria, located in Mezdra, by 2025. Its second factory in Karnobat will continue to operate at reduced capacity, BTA reported. The decision comes as the company..
State-owned dairy company LB Bulgaricum will start modernising its production facility in Vidin in September. The first step will be to renovate the refrigeration units and repave the alleys leading to the workshops and the car park in..
The Minister of Innovation and Growth, Rosen Karadimov, has not given up on the idea of the Bulgarian Development Bank (BDB) granting preferential loans to those working in the public sector. In an interview with BNT, he said that..
On October 4, 1974, the construction of the Hemus Motorway from Sofia to Varna started. Back then, the chairman of the State Council and..
+359 2 9336 661