The government has approved a report on the possibilities of building a new reactor on site 2 at Kozloduy NPP. The environment assessment has approved the technology of the American AP 1000 units and the Russian technologies for Belene NPP, Energy Minister Temenuzhka Petkova said. In the report, the experts support realization of Unit 7 at Kozloduy NPP with available equipment from the Belene NPP project.
"I think that after the 7thunit, we could go on to built 8th one," Prime Minister Boyko Borissov said, pointing out that the projects were in accordance with EU goals for climate neutrality by 2050 and diversification of energy resources. A model for financing of the new capacity is to be prepared, BTA reported.
The leader of "DPS-New Beginning" Delyan Peevski has called on the caretaker government and all responsible institutions, including the parliament, to give MEP Elena Yoncheva a mandate to negotiate for the release of the captured..
God has gifted people with an incredible quality - to dream. And we dreamt of hearing Bulgarian in the Getty Museum during the opening of an incredible exhibition. An exhibition dedicated to an ancient people, an exhibition that..
An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second..
Today, Vice President Iliana Iotova is opening the exhibition “Ancient Thrace and the Classical World: Treasures from Bulgaria, Romania, and Greece” at..
In the elections on October 27 this year there were problems in both phases of the process - when the votes were submitted and when they..
+359 2 9336 661