An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
The Council of Ministers has approved the draft of a donation agreement between the World Health Organization and Bulgaria on the provision of a voluntary contribution, amounting to EUR 100,000, in support of the activities of the organization in the..
Bulgaria’s caretaker Foreign Minister Ivan Kondov and his Albanian counterpart Igli Hasani confirmed the firm commitment of the two countries to the accelerated construction of transport Corridor 8. Romania has asked to join the construction..
Winds of up to 120 kms. per hour inflicted damage in Vratsa, the biggest town in Bulgaria’s Northwest. Dozens of reports have come in of fallen trees and branches onto vehicles and roads, damaged equipment and torn overhead cables. There were..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
+359 2 9336 661