Bulgaria’s Road Infrastructure Agency has announced a public procurement order for the design and construction of the first (75 kilometer-long) section of the Ruse-Veliko Tarnovo Motorway, with an estimated value of nearly EUR 500 million, a BNR reporter informed.
The entire route of the future motorway is over 130 kilometers long and is divided into three sections: Ruse - Byala, a bypass of the town of Byala and Byala - Veliko Tarnovo.
The Road Infrastructure Agency has proposed that the project for construction of the highway be included for funding under the "Transport Connectivity" 2021-2027 operational programme. The motorway will start 3 km east of Danube Bridge near Ruse and will reach the town of Debelets, where traffic will divide in two directions- towards the Pass of the Republic and Shipka Pass.
The first group of Bulgarian citizens evacuated from Lebanon with the help of Canada came home last night, the Bulgarian Foreign Ministry has announced. This took place in close coordination between the Foreign Ministry’s Situation Centre, the..
On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest temperature will be 19-20°C, while in the eastern regions of the country the temperature will reach up to..
The Court of Justice of the EU has overturned part of European legislation requiring trucks for international transport to return every two months to the carrier's base. With its decision, the institution confirmed all other..
In December this year the Ministry of Finance will have covered the last of the criteria for accession to the Eurozone – inflation, said caretaker..
On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest..
30 buildings across the country will be illuminated in green tonight to mark European Donation Day – the European Day for Organ, Tissue and Cell..
+359 2 9336 661