The construction of the first seventeen kilometer-long section of Europe motorway connecting the towns of Dragoman and Slivnitsa has been completed, Road Infrastructure Agency announced, BTA informs. Construction works ended six months ahead of schedule. The section is part of the Pan-European corridor London-Budapest-Belgrade-Sofia-Plovdiv-Istanbul-Calcutta, which is the shortest road connecting Western Europe, the Near East and the Middle East.
Europe motorway connecting Kalotina border crossing and Bulgaria’s capital Sofia is 48 kilometers long. Construction of the 14.5 kilometer section between the Bulgaria-Serbia border and the town of Dragoman continues.
The third section of the motorway between Slivnitsa and Sofia will be 16 kilometers long. The technical design of the new section is being prepared.
The first group of Bulgarian citizens evacuated from Lebanon with the help of Canada came home last night, the Bulgarian Foreign Ministry has announced. This took place in close coordination between the Foreign Ministry’s Situation Centre, the..
On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest temperature will be 19-20°C, while in the eastern regions of the country the temperature will reach up to..
The Court of Justice of the EU has overturned part of European legislation requiring trucks for international transport to return every two months to the carrier's base. With its decision, the institution confirmed all other..
In December this year the Ministry of Finance will have covered the last of the criteria for accession to the Eurozone – inflation, said caretaker..
30 buildings across the country will be illuminated in green tonight to mark European Donation Day – the European Day for Organ, Tissue and Cell..
On Sunday the weather will be predominantly cloudy, with the clouds scattering temporarily over Western Bulgaria. There will be rain in many parts with..
+359 2 9336 661