Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

President Radev has his own draft constitution ready

President Rumen Radev
Photo: BTA

This government is finished in a moral aspect. It is important that the government ends formally as well, Bulgaria’s President Rumen Radev said. The rest is agony and waste of historical time. Moreover it fuels peoples’ anger further. The failed government cannot lead any constitutional debates and determine the future of this country, President Radev said during the opening of the new academic year at the Military Academy in Sofia.

An expert cabinet would mean a deception to the expectations of the people. If an expert cabinet is formed, the regime of Premier Boyko Borissov will again organize the elections and guarantee lifelong government. I have my own draft constitution ready, but I will not get involved in any debates until I see unconditional resignations, Rumen Radev said.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Minister of Innovation: There was video surveillance in more than 99.5% of the polling stations

Over 99.5% of Bulgaria's polling stations were covered by video surveillance in the October 27 parliamentary elections. This was stated at a briefing by the Caretaker Minister of Innovation and Growth Rosen Karadimov, appointed by the caretaker..

published on 11/4/24 6:05 PM

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM