Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Greece requires negative PCR test for arrivals from Bulgaria by plane

Photo: BGNES-archive

The restrictive measure will take effect on July 28, when the Greek border authorities will start requiring negative PCR test for Covid-19 performed up to 72 hours prior to entering this country, the Bulgarian Ministry of Foreign Affairs announces. The certificate must be translated in English and must contain first, middle and surname of the passenger, as well as number of passport or ID card. The tests will be recognized if they are performed at private or national laboratories accredited by the state authorities. On July 28 and 29 travellers who have not managed to undergo Covid-19 tests will be tested by the Greek border authorities upon their arrival in Greece. The requirement for passenger locator form (PLF) generating a QR code at least 24 hours prior to arrival remains in place. No changes in the requirements for crossing the land borders between the two countries have been made.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Minister of Innovation: There was video surveillance in more than 99.5% of the polling stations

Over 99.5% of Bulgaria's polling stations were covered by video surveillance in the October 27 parliamentary elections. This was stated at a briefing by the Caretaker Minister of Innovation and Growth Rosen Karadimov, appointed by the caretaker..

published on 11/4/24 6:05 PM

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM