Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Power system’s cold reserve to be provided only by state-owned thermal power plant

“Varna” thermal power plant.
Photo: archive

At a cabinet sitting via video conference Prime Minister Boyko Borissov ordered Energy Minister Temenuzhka Petkova to make sure that from now on the cold reserve of the power system will be ensured only by the state-owned Maritsa Iztok 2 thermal power station, the government press service has announced.

Yesterday, Hristo Ivanov, co-chairman of the non-parliamentary coalition Democratic Bulgaria accused the government of having turned the cold energy reserve into the “philosopher’s stone” of the leader of the Movement for Rights and Freedoms Ahmed Dogan, who owns “Varna” thermal power plant. According to Hristo Ivanov in the space of just 2 years Ahmed Dogan has received from the state over 25 million euro for having the energy reserve maintained by “Varna” power station even though in this period it has only functioned five times.

The Supreme Prosecutor's Office of Cassation announced that based on Hrtisto Ivanov’s statement a probe will be initiated to look into whether a case has been opened or pre-trial proceedings initiated. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Weather forecast: Over the weekend temperatures will rise

On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..

published on 7/5/24 6:45 PM

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..

published on 7/5/24 6:13 PM

160 more workers laid off at ContourGlobal Maritsa East 3 coal-fired power plant

ContourGlobal Maritsa East 3 TPP has announced that another 160 people from the coal-fired power plant will be laid off in the coming months after the procedure for notifying the institutions and the workers has been completed, the company’s..

published on 7/5/24 4:40 PM