In a joint analysis, the Dusseldorf Institute for Macroeconomics, the Vienna Institute for International Economic Studies WIIW and the French OFCE Institute have called on the EU to invest the billions planned for recovery from the Covid-19 crisis in two key projects.
The first is for a trans-European high-speed railway to connect all European capitals and the second for a "European Silk Road" to Moscow and the countries of the Caucasus. Both projects have key routes through Bulgaria. 853 km of "Ultra-Rapid-Train" or "Trans Europa Express" must pass through Bulgaria, and the cost of the Bulgarian section is 59% of the current GDP of the country, the analysis shows. A total of 18,250 km in the EU would cost 1,1 trillion euros.
A total of 259 reports of vote buying for the early parliamentary elections on October 27 have been submitted to the Ministry of Interior. 70 pre-trial proceedings have been initiated, 36 people have been detained, Minister of the..
Sixth-grader Mira Koseva won the title of "Global Winner" at the Kangaroo Global Linguistics 2024. She placed first in level A1 and won the highest award for Bulgaria, the Ministry of Education and Culture announced. Mira studies..
In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the..
Swedish environmental activist Greta Thunberg arrived in Sofia by train, eyewitnesses report on social media. Thunberg was spotted walking along Sofia’s..
Caretaker Minister of the Environment and Water, Petar Dimitrov, says he does not think there was a problem in the location of the air..
A Bulgarian siphoned 2.2 million pounds from the money of British taxpayers, the "Sunday Telegraph" reports. The scheme involved flying..
+359 2 9336 661