Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Sergei Stanishev: Bulgaria needs economic anti-crisis staff

Photo: BGNES

The EU has taken economic measures to tackle the effects of the pandemic. Using reserves of the European budget, for example, funds have been allocated and Bulgaria has received about 2.7 billion levs (1.4 billion euros) for emergency spending - healthcare and business support. This was what MEP Sergei Stanishev has told the BNR.

However, countries must also take measures on national level, which is within their competence. Regarding the medical part in managing the crisis, Bulgaria has done well. But it needs an anti-crisis economic headquarters with the participation of all institutions and leading political forces, in order to draw up a national plan. According to Stanishev, the economic measures being taken in the country at the moment were partial.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Education minister Krasimir Valchev

Bilingual children returning from abroad should have additional Bulgarian lessons

The Bulgarian education system and the law on preschool and school education do not provide for the so-called language integration , Minister of Education Krasimir Valchev admitted to the relevant parliamentary committee. According to him, this means..

published on 3/21/25 1:28 PM
Radostin Vasilev

MECH are threatening with blockades and protests if their parliamentary group is not recognized

If there is no parliamentary group of the ''Morality, Unity, Honor'' party (MECH) on March 26, we will start blockades, said MECH leader Radostin Vassilev at a press conference. He demanded the resignation of National Assembly Speaker Natalia..

published on 3/21/25 12:04 PM

The construction of the Shipka tunnel may begin by the end of 2025

Another major infrastructure project in Bulgaria is moving forward. The technical project for the construction of the tunnel under Mount Shipka will be ready this year. If approved, the construction of the facility will begin as early as 2025,..

published on 3/21/25 11:39 AM