The binding phase of the market test for the reservation of capacity from the floating liquefied natural gas terminal near the Greek town of Alexandroupolis on the Aegean coast has been successfully completed. Greek, international companies and end-users have confirmed their interest, the company Gastrade has reported. The binding offers are for a period of up to 15 years and have reached a volume of 2.6 billion cubic metres annually.
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this occasion, Caretaker Environment Minister Petar Dimitrov called for work to improve and repair the water..
From March 30, 2025, a new direct flight will connect Sofia and Pisa, Italy. A statement from Sofia Airport states that the flights will be operated by the low-cost airline Ryanair and will operate three times a week - every Tuesday, Thursday and..
The parliamentary group of Democratic Bulgaria has offered GERB-SDS and "BSP-United Left" to vote "for" the candidacy of Silvi Kirilov from ITN for the post of Speaker of the 51st National Assembly. Yordan Ivanov, MP from "We Continue the..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661