The binding phase of the market test for the reservation of capacity from the floating liquefied natural gas terminal near the Greek town of Alexandroupolis on the Aegean coast has been successfully completed. Greek, international companies and end-users have confirmed their interest, the company Gastrade has reported. The binding offers are for a period of up to 15 years and have reached a volume of 2.6 billion cubic metres annually.
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The weather forecast is for worsening conditions, rain and snow showers and strong winds. Snow is..
The Ministry of the Interior has submitted 13,000 reports about poor road conditions in 2024 . This was revealed in an interview with Nova TV by Chief Commissioner Maria Boteva, who added that more than 2,000 additional reports were submitted in the..
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the precipitation will pick up from the Northwest. During the day on Sunday the rain will continue, and..
It is 21 years today since the tragedy in the River Lim on the border between Serbia and Montenegro, in which 12 Bulgarian children were killed. On..
The President of Bulgaria, Rumen Radev, and the King of Jordan, Abdullah II, are hosting the Aqaba Process Summit, which focuses on the Balkans and brings..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
+359 2 9336 661