The European Commission has approved 77 million EUR from the European Regional Development Fund to improve Sofia's integrated waste management system. The money is earmarked for the construction of a highly efficient plant for the simultaneous production of heat and electricity with fuel obtained from non-recyclable household waste. The process, called cogeneration, will provide the citizens of Sofia with affordable energy and will be environment-friendly. The facility will produce about 55 megawatts of heat and 19 megawatts of electricity. This will provide heat to 40,000 people and electricity to 30,000.
As of 1 December until the end of February, driving an old car in the centre of Sofia will be subject to a EUR 25-100 fine. The fines for legal entities will be 10 times higher – from EUR 500 to EUR 1,000. The low emission zone was put in place..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for coordinating the budget, Ivaylo Mirchev from Democratic Bulgaria said in an interview with public service..
A campaign against street violence named Stand Up will be held today and tomorrow under the dome of Sofia's Largo, said the Regional History Museum – Sofia. It turns out that over 80% of women worldwide have experienced some form of street..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661