A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
The leader of “МРФ – New Beginning” Delyan Peevski has expressed his readiness to take the post of prime minister. “When we are the first party, I will form a government,” he said on the sidelines of the National Assembly. “If the Bulgarians give..
The chairman of GERB Boyko Borisov once again stated that the winning formula for forming a regular government is for it to be supported by GERB-SDS, “We Continue the Change – Democratic Bulgaria”, “BSP – United Left” and ITN. However, he clarified that..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this occasion, Caretaker Environment Minister Petar Dimitrov called for work to improve and repair the water..
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%,..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
At the opening of a business forum in Ho Chi Minh City during his official visit to Vietnam, Bulgarian President Rumen Radev pointed out that Bulgaria..
+359 2 9336 661