Corinth Pipeworks, a part of Cenergy Holdings, has won the 58.2m-euro tender for delivery of pipes for construction of the gas interconnector between Bulgaria and Greece.
The Greek pipe maker was one of the three pre-selected candidates, one of which withdrew from the procedure, while the other did not meet the technical requirements. Bulgaria plans to start using the 182-kilometer gas pipeline from 2020 onwards to import Azerbaijani gas and thus end its almost full dependence on Russian natural gas.
Caretaker Premier Dimitar Glavchev has convened a meeting at the Council of Ministers to discuss measures for the safe evacuation of Bulgarians from Lebanon, the government press service reported. Representatives from the Ministry of Foreign Affairs,..
Nikola Nikolov - Pascal, considered one of the largest smugglers, has been arrested in Serbia during a joint operation by Bulgarian and Serbian special services. The name of the detainee gained notoriety during the arrest of former National..
The number of visits of foreign tourists to Bulgarian museums in 2023 was 988,000, according to data from the National Statistical Institute. This is an increase of 56.4% compared to the previous year, said Deputy Minister of Tourism Pavlin Petrov...
The changes to the Recovery and Resilience Plan must be sent no later than October 20, so that the European Commission can accept them..
During a short meeting on the sidelines of the UN General Assembly in New York, Bulgarian caretaker Minister of Foreign Affairs Ivan..
The caretaker government has adopted National Program for Prevention and Protection from Domestic Violence for the period 2024-2026 ,..
+359 2 9336 661