Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

General Electric interested in participating as potential supplier of equipment and engineer of Belene NPP

Photo: BTA

The US Company General Electric expressed interest in participating as potential supplier of equipment and engineer of the Belene NPP project. Bulgaria’s Minister of Energy Temenuzhka Petkova told the Bulgarian Telegraph Agency that so far Bulgaria held talks with several potential investors, including the Chinese state-owned nuclear corporation CNNC, Korea Hydro and Nuclear Power (KHNP). The French company Framatome also showed interest in Belene project. Minister Petkova underlined that the parameters of the future nuclear power plant in Belene were set by the decision of the Bulgarian National Assembly. The future nuclear facility will be based on market principles without the provision of a corporate guarantee and long-term contracts for purchase of electricity.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Made in Bulgaria – Union of Small and Medium Enterprises presents its annual awards

The association "Made in Bulgaria – Union of Small and Medium Enterprises" will hold its 31st Golden Martenitsa Award Ceremony this evening at 6:00 pm. President Rumen Radev is also expected to attend the event. The "Golden Martenitsa" award was..

published on 2/27/25 6:10 AM

Cloudy and foggy weather expected on Thursday, temperatures in wide limits

On Thursday, minimum temperatures in Bulgaria will be in wide limits, from minus 6° - minus 8°C in places with fog, to about 5°C in the extreme southwestern regions of the country. In Sofia, it will be about minus 1°C.  During the day,..

published on 2/26/25 7:15 PM
Deputy Premier Tomislav Donchev

Bulgaria will try to save part of the second payment under the Recovery and Resilience Plan

Our country has a six-month deadline until the end of August 2025 to restart the process of adopting the laws related to the Recovery and Resilience Plan. This will be done in an attempt to save most of the second payment under the plan,..

published on 2/26/25 6:32 PM