Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
In a letter to Minister of Education Galin Tsokov, the Bulgarian Industrial Capital Association expresses concern over the state plan for admissions for the 2025-2026 academic year, in which the number of vocational classes in schools are being..
The Sofia City Prosecutor’s Office has initiated pre-trial proceedings regarding an organized criminal group for the trafficking of migrants, the prosecutor’s office has announced. Evidence was collected during the investigation regarding 16..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the Ministry of Interior announced on International Day for the Elimination of Violence against Women. A..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
As of next year, use of solid fuels for domestic heating in buildings which are part of central heating and gas supply networks will be banned in nine..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
+359 2 9336 661