With an investment cost of less than EUR 10.5 billion, with a ratio of 70:30 for attracted and own capital and an interest rate below 4.5%, the Belene NPP project is viable. This is the conclusion in an analysis made by the Bulgarian Academy of Sciences that has been commissioned by the Bulgarian Energy Holding.
The project would become significantly more viable in case the state is involved. In the region there is a shortage of base capacity of about 2000 MW. The worst option is if nothing is done on the Belene project, the Bulgarian Academy of Sciences said.
"The ultimate decision for Belene should only be made after a broad discussion of this analysis”, Energy Minister Temenuzhka Petkova commented at the presentation of the report. She stressed that the Belene N-plant decision should be made quickly but not hastily.
One million and eight hundred Bulgarian citizens travelled as tourists during the third quarter of the year, National Statistical Institute data show. 72.3% of them travelled inside the country, 20.8% travelled abroad and 6.9% - both inside Bulgaria..
“Investing in people, education, innovations and technologies is the key to success in the future,” said President Rumen Radev at the opening of the business forum in Singapore, in which representatives of companies from Bulgaria and Singapore are..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she said she was optimistic about Austria’s decision. Asked what the arguments are for blocking the..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an..
+359 2 9336 661