The Russian energy corporation Rosatom has confirmed its readiness to work under the Belene NPP project. The Executive Director of Rosatom Central Europe Vadim Titov took part at a conference on sustainable nuclear energy. Rosatom signed with Bulgaria various contracts linked with the supply of nuclear fuel to Kozloduy NPP and the extension of the lifetime of the 5th and the 6th units of the nuclear power plant, Vadim Titov underlined. Taking into consideration our excellent relations at present, Rosatom would participate at the Belene NPP project, Vadim Titov contended.
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would lift its veto and that Bulgaria and Romania would probably become full members of Schengen from the..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
+359 2 9336 661