Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prime Minister Borissov inspects construction of section of transit gas pipeline to Turkey

Photo: BGNES

We have been working on one of our main priorities in the energy sector - diversification of sources and routes for supply of natural gas, Bulgarian Minister of Energy Temenuzhka Petkova said during a joint inspection with Prime Minister Boyko Borisov on the construction of the Lozenets - Nedyalsko section of the transit gas pipeline for Turkey.

The project is of key importance to the development of the existing interconnection of Bulgaria with its southern neighbor. The facility is expected to be operational in 2018. The Prime Minister pointed out that the government was also working on the interconnectors with Serbia and Greece. "We respect the European legislation and the requirements of the Third Package when implementing the projects; everyone can pay transit fees and transit through Bulgaria," Borisov said.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

GERB will not sign PP/DB’s declaration for a cordon sanitaire around Delyan Peevski, Boyko Borissov says

During the regional GERB youth academy in Targovishte, GERB leader Boyko Borissov stated that GERB would not sign the declaration of We Continue the Change/Democratic Bulgaria (PP/DB) for a cordon sanitaire around Delyan Peevski. PP/DB calls..

published on 11/30/24 3:17 PM

Protest in Velingrad in support of farmers with flocks which tested positive for sheep and goat plague

A protest took place in Velingrad in support of the farmers whose flocks of sheep have been quarantined because of positive tests for sheep and goat plague. To stop the spread of the disease, access to the area around the farms has been..

published on 11/30/24 1:10 PM

EC gives Bulgaria 6 months to introduce necessary reforms under the Recovery and Resilience Facility, or it may lose EUR 653 million

Bulgaria will be given six months to carry out the necessary reforms connected with the liberalisation of the energy market , otherwise it stands to lose EUR 653 million which it should receive as a second payment under the Recovery and..

published on 11/30/24 11:55 AM