Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prime Minister Boyko Borissov expects EC to allow direct gas pipeline from Russia

Photo: BGNES

Bulgarian Prime Minister Boyko Borissov has announced he is waiting for a letter from the European Commission that would allow a link to the Turkish Stream gas pipeline project to reach Bulgaria directly so deliveries are not to be dependent on Turkey.

The pipeline capacity for Bulgaria is expected to be 15.7 billion cubic meters of gas. At the same time, it became clear that Moscow was planning a second pipe of "Turkish Stream". It is currently believed that it would go directly to Turkey, and from there natural gas will enter Europe either through Bulgaria or Greece.

Chances of Bulgaria to get these 15.7 billion cubic meters of gas have increased significantly in recent months. Bulgaria has also received indirect support from Serbia, Hungary and the Austrian giant OMV, who called that the pipeline should pass through this country.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rain and hail expected over the western regions of Bulgaria

During the next 24 hours, cumulus clouds will develop again over the western half of the country. At night, there will be short-term rainfalls and thunderstorms in many places. There are conditions for hail and local intense phenomena..

published on 6/27/24 6:50 PM

President Radev refuses to lead Bulgarian delegation to NATO summit

President Rumen Radev did not accept the Council of Ministers' proposal to lead the Bulgarian delegation to the NATO summit in Washington, the presidency said.  Rumen Radev did not agree with certain provisions of the framework positions adopted..

published on 6/27/24 6:12 PM

No leakage of radioactive water from Kozloduy NPP into the Danube after an incident

After an accident that took place when Unit 6 of the Kozloduy NPP was shut down for repairs, no personnel were exposed to radiation, no leakage of radioactive water into the Danube River occurred, and some operators from the plant..

published on 6/27/24 3:32 PM