A bilateral commission has been working on a project for construction of high-speed railway line between the Greek port of Alexandroupolis and Burgas Port. The financing will be provided by the European Union as part of the agreement for railway corridor between the ports on the Aegean Sea and the Black Sea. According to preliminary studies, the Greek-Bulgarian project would reduce the time necessary for transfer of goods from two days to six hours only. Currently, the merchandise between those two ports is transferred by sea through the Bosphorus. The delivery price will be also reduced significantly.
A total of 249 projects for electricity generation from renewable sources and electricity storage, worth about 268.9 million euros will be financed under the National Recovery and Resilience Plan, the Ministry of Energy reported. The..
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second half of October, the regional departments of the Ministry of Environment and Water launched a..
Today, Vice President Iliana Iotova is opening the exhibition “Ancient Thrace and the Classical World: Treasures from Bulgaria, Romania, and Greece” at the Getty Museum in Los Angeles, the presidential press service has announced. Bulgaria,..
Over 1/3 of the cases of African swine fever among wild boars in Europe have been registered in Bulgaria , the Association of Pig..
An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities..
17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war..
+359 2 9336 661