Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Romania’s Energy Minister Grigorescu: gas interconnection between Romania and Bulgaria is important for whole region

Photo: me.government.bg

Bulgaria and Romania are working very hard this summer on the construction of the gas interconnection and we expect that the main pipeline will be completed by the end of 2016, Romania’s Minister of Energy Victor Grigorescu told media. In Minister Grigorescu’s words, that was a very difficult project from a technical point of view. However, my excellent cooperation with Bulgaria’s Minister of Energy Temenuzhka Petkova contributes to the fulfillment of the gas interconnection project, Victor Grigorescu went on to say. That project is important to Bulgaria, Romania and to the whole region. It is a wonderful example of how regional cooperation can improve the energy security of Bulgaria and Romannia, Minister Grigorescu said.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Warning for significant precipitation in ten regions of eastern Bulgaria

On Tuesday, the lowest temperatures will be between minus 5 and 0°C; in Sofia - around minus 5°C. It will remain cold and cloudy with snowfalls over most of the country and rainfall in the southeastern regions. The snow cover will..

published on 2/17/25 6:55 PM

President Radev names Sofia Airport after the Apostle of Freedom Vasil Levski

Bulgaria’s President Rumen Radev named Sofia Airport after the Apostle of Freedom Vasil Levski, the press secretariat of the head of state announced.  Thus, its official name becomes Vasil Levski Sofia Airport. According to the Constitution, the Head of..

published on 2/17/25 5:52 PM

EC closes the infringement procedure against Bulgaria related to the flood risk management plans

The European Commission has decided to close the infringement procedure against Bulgaria for the non-implementation of its obligations to review and update the Second Flood Risk Management Plans and the Third River Basin Management Plans.  A statement..

published on 2/17/25 5:40 PM