Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria and Romania to build back-up gas pipeline under Danube

Photo: EPA/BGNES

Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Caretaker Defence Minister Atanas Zapryanov

Bulgaria must be prepared for all scenarios in the Middle East: Defence Minister Atanas Zapryanov

We must be prepared for the worst-case scenario because the situation is escalating after Iran’s direct attack against Israel, said caretaker Minister of Defence Atanas Zapryanov for public service TV BNT. “We have response steps which is the next..

published on 10/4/24 10:51 AM

Rose oil production up by 10% in 2024

10,335 tons of roses have been produced in Bulgaria in 2024, almost 1,000 tons more than last year, the Consultative Council on Oil Bearing Roses says. There are almost 3,000 rose producers registered in the country, and 53 rose oil distilleries..

published on 10/4/24 9:59 AM

Market Links survey: 6 parties and coalitions enter future parliament

If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links poll, commissioned by bTV shows. GERB/SDS would earn 23.1% of the votes, followed by We..

published on 10/4/24 9:52 AM